EV Charger Installation in Portland: Do You Need a Panel Upgrade First?

Many Portland homeowners are installing Level 2 EV chargers — but not every panel can handle the added load.

At Smiley Electric, Inc., we perform load calculations before every EV installation.

When You Likely Need an Upgrade
  • 100-amp panel
  • No open breaker space
  • Multiple high-load appliances
  • Planning future electrification

Typical EV Charger Requirements

  • 40A–60A dedicated circuit
  • 240V connection
  • Proper grounding and permitting

Installing without proper capacity risks nuisance tripping and overheating.

👉 Schedule a load evaluation before installing your EV charger.