100 amp vs 200 amp panel: which does my house need?

Which one, in plain terms

If your heat, hot water and stove run on gas and you're not adding anything big, 100 amps is often enough. You don't need 200 because 100 sounds small. We'll tell you so, and we won't sell you a bigger panel than the house needs.

200 amps comes up when big electric loads go on a 100-amp house: a car charger, a heat pump, an electric range, a hot tub. It also comes up when you plan to take the whole house off gas.

The size of the house doesn't settle it. What settles it is how much the house already runs on electricity and what you want to add. We add that up before we quote. Electricians call it a load calculation. You get a straight answer, in plain words, and the reasons behind it.

One thing first. If the panel is hot to the touch, buzzing or smells hot, you don't have a sizing question. Don't touch it, and call. Emergency calls are answered 24/7, and same day is often available for everything else, so call and ask what's open. If you see smoke or flames, get everyone out and call 911.

What the number means

It's how much power the whole house can pull at one time. A 100-amp service at 240 volts is 24,000 watts. A 200-amp service is 48,000.

Take a car charger. Tesla's manual puts its Wall Connector at 48 amps and 11.5 kilowatts on its biggest setting. That's close to half of a 100-amp service for as long as the car is charging. The Department of Energy says most home Level 2 chargers run at up to 30 amps, which is 7.2 kilowatts and a lot easier to fit.

Not everything in a house runs at once, and the load calculation takes that into account. So two houses with the same 100-amp panel can get two different answers. That's why we look at your house and not at a chart.

How to tell what you have

Find the main breaker. It's the big one that shuts off the whole house, and it has a number on the handle, like 100, 125, 150 or 200. In some houses it's outside, next to the meter.

That number is usually the size of your service, but it doesn't prove it. The meter base and the wires that feed the panel have their own ratings, and we check those too.

Leave the metal cover that the breakers stick through right where it is. The CPSC's home wiring guide says taking that cover off is a job for an electrician. Take a photo of the panel and one of the meter and send them to us. That usually tells us a lot. One property manager who works with us put it this way: "We provide information about the issue plus a photo of the electrical panel then we are provided an estimate with an opportunity to schedule the work. Very smooth."

If the house still runs on screw-in fuses, the service may be smaller than 100. The CPSC guide calls a four-fuse panel 60-amp service. Send us a photo of that too.

When 100 amps is enough

None of these is a sure thing. The more of them that fit your house, the better the odds that 100 is fine.

  • The furnace, the water heater and the range all run on gas.
  • You have no car charger, hot tub or heat pump, and you're not planning one.
  • The panel is in good shape and still has open spaces. Not sure about yours? Here's how to tell if a panel is outdated.

When 200 comes up

These are the jobs where we end up talking about more amps.

  • A car charger at full speed. A charger that puts out 48 amps needs a 60-amp circuit. We run a load calculation on every EV charger job, so you know before we start.
  • A heat pump, an electric furnace or a heat-pump water heater going in where gas used to be.
  • An electric or induction range replacing a gas one.
  • A lot of the house going electric at once, or an ADU or a shop being added. We wrote up subpanels for garages, ADUs and shops.

A full panel is not on that list. No open spaces means there's no room for the next breaker, and a subpanel can fix that. A subpanel adds spaces. It doesn't add power, so the math still has to work.

A breaker that trips is not on the list either. That's often one circuit with too much on it. We wrote up why a breaker keeps tripping.

Adding a car charger and staying at 100

It can be done in a lot of houses. Many chargers can be set lower when they go in. Tesla's Wall Connector, for one, gives 48 amps on a 60-amp breaker, 40 on a 50, or 32 on a 40.

The other way is a load management device. It watches what the house is using and holds the charger back when the house is busy. Oregon's electrical code lets the charger be counted at that limit, so the service can stay the size it is. More in whether a car charger needs a panel upgrade.

If a smaller fix does the job, that's the one we'll tell you about. It's your money, and we'd rather you call us again for the next job than feel sold on this one.

What about 125 or 150?

Panels come in sizes between the two, and for some houses one of those is the right call. In Portland we've replaced 125-amp panels and 200-amp panels.

The meter base is different. That's the box outside that the meter plugs into. PGE's rule book lists three sizes for a house: 100, 200 and 400. So on a PGE service, going past 100 amps means a 200-amp meter base, whichever panel you pick. If you're quoted a 150, ask what the 200 would cost.

Going from 100 to 200 is more than a bigger breaker

You can't get there by swapping the main breaker. The meter base, the pipe that runs up the wall (the mast) and the heavy wires between them usually have to be sized for 200 too. That's a service upgrade, and it's a bigger job than replacing a panel at the size you already have. We wrote up panel upgrade vs service upgrade.

Oregon requires a permit before the work starts. PGE's rule book says raising the amps on a service takes a permit, a passed local inspection and PGE's own inspection before they reconnect. It also says to check with PGE before a Level 2 car charger goes in, so they can look at whether their side can carry it. Pacific Power has its own rule book. We pull the permit on every job that needs one, and on our jobs we handle the power company too, so you don't have to make those calls.

Josh Smiley is a master electrician with 20+ years in the trade, and he and his crew treat your house like their own. They show up when they say, cover the floors, explain what they're doing and leave the work area clean. We follow up after the job and stand behind it with a one-year warranty. We're licensed, bonded and insured, Oregon CCB #227116, and we're a Black-owned business, MBE and ESB certified. One customer wrote: "These guys are a solid operation. Would use them again in a heartbeat."

What it costs

Plan on $2,500 to $7,500 for a panel upgrade in the Portland area. Meter, mast or service wire work can push a job past that. Our Portland panel upgrade cost guide goes through what moves the number.

Ballpark quotes by phone or photo are free. The firm number is the written estimate, and for some houses we need to see the panel and the meter before we can write it. Either way, you get the price before we start, and it stays the price unless you ask for more.

We work Monday to Saturday, 7am to 5pm. Call us and tell us what's on your panel. If you aren't sure what you need, that's a fine place to start. We'll help you work it out.

Frequently asked questions

Is 100-amp service enough for my house?

Often, if the furnace, the water heater and the range run on gas and you're not adding a car charger, a heat pump or a hot tub. It gets tight when big electric loads go in. The way to know is to add up what the house runs and what you want to add. We do that before we quote, and if 100 is enough we'll say so.

Do I need 200 amps for a car charger?

Not always. It depends on what else the house runs. Many chargers can be set to a lower amperage when they're installed, and a load management device can hold the charger back when the house is busy. Either one can let a 100-amp house keep the service it has. We run a load calculation on every EV charger job.

How do I know what size service I have?

Read the number on the handle of the main breaker, the big one that shuts off the whole house. It usually says 100, 125, 150 or 200, and it's usually the size of your service. Leave the metal cover on the panel. A photo of the panel and one of the meter lets us confirm it.

Can I just put in a bigger main breaker?

No. The meter base, the mast and the service wires are sized for the service you have now. Going from 100 to 200 amps is a service upgrade. It takes a permit and an inspection, and the power company has to disconnect and reconnect the house. We pull the permit and handle the power company.

How much does it cost to go from 100 to 200 amps?

Plan on $2,500 to $7,500 for a panel upgrade in the Portland area. Meter, mast or service wire work can push a job past that range. Ballpark quotes by phone or photo are free, and the firm number comes in a written estimate.

Is the work guaranteed?

Yes. We follow up after the job, and the work carries a one-year warranty. We're licensed, bonded and insured, Oregon CCB #227116.

Free printable guide

Take this guide with you

This whole page as one PDF you can print, save to your phone or pass along. No sign-up, no email.

Download the PDF

Sources and how to cite this page

Reviewed by Joshua Smiley, owner & master electrician at Smiley Electric, Portland, Oregon (Oregon CCB #227116). Last reviewed . General information, not a substitute for an on-site inspection.

Sources

  1. Smart Charging Program, Portland General Electric
  2. Charging Electric Vehicles at Home, U.S. Department of Energy, Alternative Fuels Data Center

Cite this page

Smiley Electric. “100 amp vs 200 amp panel: which does my house need?” smileyelectric.net/help/100-amp-vs-200-amp-panel/. Last reviewed November 13, 2026.

You are welcome to quote, link to or share this page in articles, class handouts, AI answers and research, as long as you credit Smiley Electric and link back to smileyelectric.net/help/100-amp-vs-200-amp-panel/.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.