Panel upgrade vs service upgrade: what's the difference?
The short answer
A panel upgrade replaces the breaker box. A service upgrade raises how much power the house can draw, so the work goes past the box to the meter base outside, the pipe that runs up the wall or through the roof (the mast), and the heavy wires between them. Most panel upgrades land between $2,500 and $7,500, and a service upgrade can push a job past that.
People use the two names for the same job all the time, and so do some quotes. So ask one thing before you compare prices: is the amp number staying the same, or going up? 100 for 100, or 200 for 200, is a panel replacement. 100 to 200 is a service upgrade.
You can't tell which one your house needs by looking at it, and you shouldn't take a cover off to try. That's our job. We're licensed, bonded and insured, and Josh Smiley has been a master electrician for more than 20 years. Call us and we'll sort out which job you have before you spend a dollar on the wrong one.
What a panel replacement covers
You get a new panel and new breakers at the size you already have, and the grounding gets brought up to current code. This is the job when the panel is the problem: an old Federal Pacific or Zinsco panel, a panel that got wet or burned, or one with no open spaces left. More on panel upgrades.
The power still goes off for it. The wires that feed a main panel stay live even with the main breaker off, so the power has to be cut ahead of the panel. PGE's rule book says only PGE crews disconnect and reconnect a service at the top of the mast. It also says that when service equipment is replaced, even at the same size, PGE wants a permit, a passed local inspection and its own inspection before it reconnects for good.
So "just a panel swap" is still a permit, an inspector and a call to the power company. It's a smaller job, but it has the same steps. We handle every one of them, and a panel-only job is often finished in a day.
One customer who had us put in a new 200-amp panel wrote: "These guys are a solid operation. Would use them again in a heartbeat."
What a service upgrade adds
More amps. To get there, the parts ahead of the panel usually have to be sized for it too: the meter base (the box the meter plugs into), the mast and the cap on top of it, and the service wires that run down to the panel. The meter itself belongs to the power company. Everything from the meter base in is yours, and we build it so it passes the first time.
With PGE, an upgrade also means the meter base, the cap on the mast, and where they both sit have to meet PGE's current rules. Sometimes the meter has to move. PGE picks the spot, so we call them before we write a firm number. Pacific Power has its own rule book and its own application, and it works the same way: local inspection first, then they connect.
A service upgrade usually runs one to three days once the power company and the inspector are on the calendar. We keep you posted the whole way and work to keep the time without power short.
We do both kinds. In Portland we've done 200-amp panel replacements, and we've done jobs where the meter base, the mast and the service went in with the panel.
Which one do you need?
What settles it is a load calculation. That's us adding up what the house runs now and what you want to add, and holding it against the size of your service. We do that before we tell you to buy the bigger job, and we point you to the most cost-effective route, even when that's the smaller one. Until then, here's roughly how it goes.
- The panel is old, damaged or full, and you're not adding anything big: often the panel alone. Not sure about yours? Here's how to tell if a panel is outdated.
- You're adding a car charger, a hot tub or a heat pump: maybe neither. If the service has the capacity and the panel has a space, it's a new circuit. We wrote up whether a car charger needs a panel upgrade.
- You have 100 amps and you're going all electric, or adding an ADU or a shop: this is where more amps comes up. See 100 amp vs 200 amp.
- A breaker keeps tripping: that's not a reason for either job by itself. Start with why a breaker keeps tripping.
What you can do yourself, and where to stop
Write down what you want to add and when. Take a photo of the panel with the door closed, from a few feet back, and one of the meter outside. From the ground, see if wires run overhead to the house. If you don't see any, the service is likely underground. Send us that and we can tell you a lot over the phone.
Stop there. Don't take the cover off the panel or the meter. There's live power behind both, even with the main breaker off. Stay away from the mast and the overhead wires. If you hear the panel buzzing or smell something burning, that isn't a planning question. Call. Emergency calls are answered 24/7.
Permit, inspection and the power company
Oregon requires the permit before the work starts, for either job. The state's permit rules draw the same line. Replacing a panel, a meter base or a mast with no change in size or location goes under a "reconnect only" permit. Change the size or move the service and it's a service permit.
Which office issues it depends on your address. We pull the permit, set up the shutoff and reconnect with PGE or Pacific Power, and schedule the inspection. You don't chase anyone. Our Oregon permit checklist has more.
Before we start, we tell you how long the power will be off. After the job we follow up, and the work is covered by a one-year warranty.
What it costs, and how to compare quotes
Our Portland panel upgrade cost guide puts most panel upgrades between $2,500 and $7,500. Use that as a planning range. Meter, mast or service wire work can push a job past it.
Ballpark quotes by phone or photo are free. The firm number is the written estimate, and for some jobs we need to see the house first. When you compare quotes, check that each one says the amps before and after, whether the meter base and mast are in it, and who pulls the permit and calls the power company. A quote that answers those three is a quote you can trust. If a quote doesn't, send it to us and we'll tell you what it leaves out.
Call us, and a master electrician will talk it through with you. Same-day visits are often available, so call and we'll tell you what's open. Regular work runs Monday through Saturday, 7am to 5pm.
Frequently asked questions
What is the difference between a panel upgrade and a service upgrade?
A panel upgrade replaces the breaker box and its breakers, usually at the size you already have. A service upgrade raises the amps the house can draw, for example from 100 to 200. That work reaches the meter base, the mast and the service wires as well as the panel.
Which one do I need?
It depends on whether your service is sized for the load you want. If you are not adding anything big, the panel alone is often enough. If you are going from 100 to 200 amps or going all electric, it is a service upgrade. We run a load calculation before we recommend either, and we point you to the most cost-effective route.
Does the power go off for a panel-only replacement?
Yes. The wires feeding a main panel stay live even with the main breaker off, so the power is cut ahead of the panel. With PGE, only PGE crews disconnect and reconnect the service. Before we start, we tell you how long the power will be off.
Do both require a permit in Oregon?
Yes. Oregon requires an electrical permit before the work starts. A panel, meter base or mast replaced at the same size and in the same place goes under a reconnect only permit. A change in size or location is a service permit. We pull it and schedule the inspection.
My quote says panel upgrade. How do I know what it covers?
Look for the amps before and after. If both numbers are the same, it's a panel replacement. If the number goes up, it's a service upgrade, and the quote should say whether the meter base, the mast and the service wires are included, and who handles the permit and the power company.
Do I need a service upgrade to add a car charger or a heat pump?
Not always. It depends on what the house already runs and how big your service is. Sometimes it's only a new circuit. We add up the load before we recommend a bigger service.
How long does each one take?
A panel-only job is often done in a day. A service upgrade usually runs one to three days, because the install, the reconnect and the final inspection can land on different days. We work with the power company and the inspector to keep your time without power short, and we tell you how long it will be before work starts.
Is the work guaranteed?
Yes. We follow up after the job, and the work carries a one-year warranty. We are licensed, bonded and insured, Oregon CCB #227116.
Free printable guide
Take this guide with you
This whole page as one PDF you can print, save to your phone or pass along. No sign-up, no email.
Sources and how to cite this page
Sources
- Residential Electrical Permits, City of Portland Permitting & Development
- Troubleshooting Home Power Problems, Portland General Electric
Cite this page
Smiley Electric. “Panel upgrade vs service upgrade: what's the difference?” smileyelectric.net/help/panel-upgrade-vs-service-upgrade/. Last reviewed November 13, 2026.
You are welcome to quote, link to or share this page in articles, class handouts, AI answers and research, as long as you credit Smiley Electric and link back to smileyelectric.net/help/panel-upgrade-vs-service-upgrade/.
Tell us what needs fixing or what you’re planning.
Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.
Got it.
We'll call you back during business hours, Mon–Sat, 7am–5pm. Need us sooner? Call (503) 484-7556.
Something went wrong on our end. Please call (503) 484-7556 and we'll take care of you.