Skip to content

What do I need for an electrical panel permit in Oregon?

The short answer

If you hire a licensed electrical contractor, you don't have to get anything. The contractor pulls the permit. On our jobs we pull it and we set up the inspection, whether it's a panel upgrade, a subpanel or a new circuit. Josh Smiley has done this for 20+ years as a master electrician, and the permit is never the part you have to chase.

If you want to do the work yourself, Oregon lets you, with limits. State law says the house has to be yours or an immediate family member's, and it can't be a house you mean to sell, rent or lease. Then you pull the permit yourself, from your city or county building department, before you start.

Either way, replacing a panel takes a permit and an inspection. Not sure which side of the line your job falls on? Call us. We'll tell you straight, and a ballpark by phone or photo is free.

Why panel work needs a permit

A permit isn't a rubber stamp. It's how a second qualified person looks at the work against the electrical code before the wall is closed up and the power is back on for years. We like that. A panel is the heart of the house, and we'd rather have an inspector sign off on our work than ask you to take our word for it.

It also protects you in plain ways. A permitted, inspected panel is the kind of work insurers and buyers are comfortable with, and unpermitted electrical work is a common sticking point when a house is sold. We pull the permit and coordinate the inspection on every job that needs one, so you never have to think about it.

Work that needs a permit

The state Building Codes Division keeps the list for houses. These need a permit:

  • Putting in or changing any permanent wiring
  • Adding an outlet or a light fixture, or running more wiring
  • Changing a fuse box to circuit breakers
  • Replacing a service panel (that one is spelled out on Portland's list)

Work that doesn't

The same state list says these don't need a permit in a house you own. If the house is a rental or you're selling it, the rules are tighter. There the state treats breakers, panels, subpanels and meter bases as work for a licensed electrician.

No permit doesn't mean no risk. A breaker that went bad usually had a reason, and swapping one means working inside the panel. We'd leave that one to an electrician.

  • Swapping a broken outlet, switch or light fixture for one like it
  • Replacing a fuse or a defective breaker
  • Replacing a dishwasher or garbage disposal that's already there

Know what you have before you apply

The permit and the work both depend on how your house is fed. When you call, it helps to know a few things. If you don't, we'll work it out from a photo of the panel.

  • Overhead or underground service
  • Service size: 100-amp, 150-amp or 200-amp (larger on some homes)
  • Single-phase, which is typical for houses, or three-phase on larger properties

Where you apply

Your city or county building department issues the permit. In Portland that's Portland Permitting & Development. The city says its online form takes about 15 minutes and the permit is issued within 24 hours after you pay. If you're upgrading the service or changing a fuse box to breakers, the form asks for the panel's amperage.

Beaverton has its own Building Division and its own online permit system. Unincorporated Washington County, Aloha for one, goes through Washington County Building Services.

Not sure who covers your address? The state keeps a Local Building Department Directory. Look up your town there.

A permit has a clock on it. It expires if the work isn't started within 180 days, or if the job sits for 180 days after it starts.

What the inspector checks on a panel job

State rules list what an electrical inspector has to look at. On a panel job that means the service wires coming in, the panel, the grounding and bonding, the breakers and the circuits and feeders. The inspector also tests the GFCI and AFCI devices.

Grounding is where we put the most care. Depending on the house, that can mean ground rods or plates and a bond to the metal water pipe. It also means the neutral and ground tied together at the main service and kept apart in any subpanel. It's a small detail, and it's exactly the kind of thing an inspection is there to catch. We do it right the first time, so the inspector has nothing to send back.

In Portland a panel change, a service change or an added subpanel gets a service inspection, and a final inspection closes the permit. State rules give the building department five working days to do a final once it's requested. The permit gets posted near the main panel so the inspector can find it.

The power company's part

Some panel jobs need the power cut at the house and turned back on after. PGE says the inspection has to be done before it reconnects. If it isn't, the electrician has to file an Emergency Reconnect Waiver first. On our jobs we set that up with the utility. You don't have to call anybody.

Do you have to turn in a load calculation?

On a regular house, no. State rules only let a building department require electrical plan review on complex jobs, like a service of 600 amps or more, or a building with six or more units.

The load calculation is still part of the job, and we do it before we quote. It's the math that says whether your service can carry what you're adding, like a car charger, a hot tub, a kiln or a heat pump. It decides whether you need a new panel or a bigger service, and we'd rather find that out on day one than halfway through the job. Here's the difference between the two.

What you can do yourself, and where to stop

Stop at the cover. Turning off the main breaker doesn't shut off the wires coming in from the utility. They stay live, and so do the lugs they land on. So we don't tell anyone to take the cover off a panel, permit or no permit.

Here's what's safe to do, and it helps whoever does the job:

  • Clear the space in front of the panel. The electrical code calls for a working space at least 30 inches wide, 3 feet deep and 6½ feet high, with nothing stored in it. Keep plumbing and gas lines out of that space too.
  • Open the panel door and read the brand name and the number on the main breaker. That number is usually the size of your service. More on 100-amp vs. 200-amp panels. If the name is Federal Pacific or Zinsco, read this guide.
  • Take a photo of the panel with the door closed and send it to us. Ballpark quotes by phone or photo are free.
  • Check the license. A contractor doing electrical work in Oregon needs a CCB license and an electrical license from the state Building Codes Division, and the permit application lists both numbers. Ask whoever you hire who's pulling the permit. Ours is Oregon CCB #227116: licensed, bonded and insured.

If somebody skipped the permit

Oregon's seller disclosure form asks whether remodeling needed a permit, whether one was pulled and whether it got a final inspection. So the question comes up when you sell.

If you've got a panel somebody changed without a permit, call your building department and ask what they want to see. If it turns out the panel needs work, send us a photo and we'll tell you what we think it'll take.

Who does the work

Joshua Smiley is the owner and a master electrician with 20+ years in the trade. Smiley Electric is licensed, bonded and insured, Oregon CCB #227116, and is a Black-owned business certified as an MBE and ESB. We follow up after the job, and the work carries a one-year warranty.

Emergency calls are answered 24/7. Regular work runs Monday through Saturday, 7am to 5pm. Same-day visits are often available, so call and ask. Tell us about the panel, and we'll tell you what the permit and the job will take.

Frequently asked questions

Do I need a permit to replace or upgrade my electrical panel in Oregon?

Yes. Portland's permit list names replacing a service panel. The state list covers changing a fuse box to breakers and any change to permanent wiring. Replacing a fuse or a defective breaker is on the state's no-permit list. If we do the job, we pull the permit and set up the inspection.

Can a homeowner pull their own electrical permit in Oregon?

Yes, for a house that's yours or an immediate family member's and isn't meant for sale, rent or lease. Portland adds that you have to live there, and the owner on record can't be an LLC. Panel work is the part we'd tell you not to take on. The wires from the utility stay live with the main breaker off.

Where do I apply for an electrical permit in the Portland area?

At your city or county building department. That's Portland Permitting & Development in Portland, the City of Beaverton Building Division in Beaverton, and Washington County Building Services in unincorporated Washington County. The state's Local Building Department Directory shows who covers each town. If you hire a contractor, the contractor applies.

How long does an electrical permit take?

Portland says its permits are issued within 24 hours after payment. After the work is done, state rules give the building department up to five working days to do the final inspection once it's requested. Other cities set their own turnaround, so ask yours.

How much clear space does an electrical panel need?

The electrical code calls for a working space in front of the panel at least 30 inches wide, 3 feet deep and 6 and a half feet high, with nothing stored in it. If yours is in a tight spot, send us a photo with the door closed and we'll tell you what we see.

Does Smiley Electric pull the permit for panel work?

Yes. On every job that needs a permit, we pull it, set up the inspection and deal with the utility. Josh Smiley, a master electrician with 20+ years in the trade, stands behind the work. It carries a one-year warranty. For a ballpark, call us or send a photo of your panel. It's free.

Free printable guide

Take this guide with you

This whole page as one PDF you can print, save to your phone or pass along. No sign-up, no email.

Download the PDF

Sources and how to cite this page

Reviewed by Joshua Smiley, owner & master electrician at Smiley Electric, Portland, Oregon (Oregon CCB #227116). Last reviewed . General information, not a substitute for an on-site inspection.

Sources

  1. Residential Electrical Permits, City of Portland Permitting & Development
  2. Licensing clarification: Residential Property Owner Scope of Work (ORS 479.540), Oregon Building Codes Division
  3. Electrical Code Program: Codes and standards, Oregon Building Codes Division

Cite this page

Smiley Electric. “What do I need for an electrical panel permit in Oregon?” smileyelectric.net/help/oregon-electrical-permit-checklist/. Last reviewed November 13, 2026.

You are welcome to quote, link to or share this page in articles, class handouts, AI answers and research, as long as you credit Smiley Electric and link back to smileyelectric.net/help/oregon-electrical-permit-checklist/.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.