Skip to content

Do I need a subpanel for my garage, ADU or shop?

The short answer

If the building needs more than one circuit, plan on a subpanel. One circuit can run out to a shed for a light and an outlet. A shop with tools, a garage with a car charger or an ADU with a kitchen needs several circuits, and the code generally allows only one feed to a detached building. So it gets one feeder, which is one set of wires from the house, and its own small breaker box. That box is the subpanel.

A subpanel gives the garage, shop or ADU its own local home for breakers. The runs stay short, the wiring stays clean and there is room to grow. When a breaker trips, you reset it out there and not back at the house.

An attached garage is more of a judgment call. If the main panel is close and has open spaces, new circuits can often go straight to it. If the panel is full, or it's on the far side of the house, a subpanel in the garage usually makes more sense. It is often a smarter fix than cramming tandem breakers into a full panel.

Not sure which side of that line you're on? Call us. Joshua Smiley, our owner and a master electrician with 20+ years in the trade, will tell you straight, and sometimes the honest answer is that you don't need one.

What a subpanel can't do

It doesn't add power to the house. It adds breaker spaces and puts them where you need them. Everything in the subpanel still comes through your main panel and your service.

So if the house has 100-amp service and it's already running an electric range, a dryer and a heat pump, a shop or a car charger on a subpanel can be more than the service can carry. Then the service has to get bigger first. We wrote up 100-amp and 200-amp panels and the difference between a panel upgrade and a service upgrade. If that turns out to be your situation, we'll tell you before you spend a dollar on the wrong piece.

The size of the subpanel comes from adding up what you want to run out there, on top of what the house already runs. Electricians call that a load calculation, and the code requires one. We do it before we quote, so we're not going to hand you a size off a chart here. Undersizing is the regret we hear about most, and the cheap time to size it right is before the trench is dug.

What you can do yourself, and where to stop

You can do the planning. It's safe, and it makes the quote faster.

  • Write down everything you want to run out there: lights, outlets, a heater, a compressor, a welder, a car charger, a hot tub. If a tool has a nameplate with volts and amps on it, take a photo of it.
  • Measure roughly how far it is from the main panel to the building. Note what's in between: lawn, a driveway, a patio, a deck.
  • Take a photo of your main panel. Leave the metal cover on.
  • Tell us what you might add later, so the feeder gets sized once.

Can I put in my own subpanel?

Oregon law lets an owner do electrical work on a house they or an immediate family member own, as long as it isn't meant for sale or rent. You still need the permit and the inspections. In Portland, the city says that does not cover an ADU or a rental.

We wouldn't start with a subpanel. Don't take the cover off a panel, and don't add a breaker or pull wire into one. With the main breaker off, the wires coming in from the utility are still live. And the rules in the next part are easy to get wrong in a way you can't see. A subpanel can look fine, work fine and still be wired wrong.

If anyone is going to dig a trench, Oregon requires a utility locate first. The request is free. It has to go in at least two business days before the digging starts.

What the code asks for at a subpanel

A subpanel is wired differently from a main panel, and this is the part homeowner installs most often get wrong. Here's what the inspector looks for, and what we build to every time.

  • Neutral and ground stay apart. In the main panel they're tied together. In a subpanel they sit on separate bars, and the feeder brings its own ground wire. If they get tied together out there, current that belongs on the neutral can end up on the metal box and on anything grounded to it, including the cases of your tools.
  • The feeder is sized to its breaker. Undersized feeder wire runs hot and fails inspection. We size it from the load calculation, not from a guess.
  • A detached building gets its own grounding. The code calls for a grounding electrode at the building, most often ground rods. In Oregon a single rod has to be backed up by a second electrode unless it tests at 25 ohms or less.
  • A detached building gets its own shutoff. There has to be a way to turn off the power at the building itself.
  • Underground wire has a minimum depth. Plastic conduit generally needs at least 18 inches of cover. Cable made to go straight in the ground needs 24.
  • Shared neutrals on multi-wire circuits need their handle ties, so the breakers shut off together.
  • The panel needs clear space: 30 inches wide, 36 inches out in front and 6 and a half feet of headroom. It can't go in a bathroom or a clothes closet. Circuits get labeled clearly, so the next person knows what's what.

Permit and inspection

Adding a subpanel takes an electrical permit in Oregon. State law says nobody works on a new electrical installation until the permit is issued. The permit comes from the building department that covers your address. We pull it and set up the inspections as part of the job, so you don't have to stand in line or learn the paperwork.

In Portland, an added subpanel gets a service inspection, and every permit needs a final inspection to close. New wiring can't be covered up until the rough-in inspection is approved. A missing permit means the work is never inspected, and the problems stay hidden behind the wall until they show up. Our Oregon electrical permit checklist has what to get ready.

What it costs and how to start

A subpanel is a planned project, so ballpark quotes by phone or photo are free. Send the list, the distance and the panel photo. A ballpark is a ballpark. The firm number is the written estimate, and for a detached building we may need to see the route before we can write it.

Smiley Electric is licensed, bonded and insured, Oregon CCB #227116, and Black-owned, with MBE and ESB certification. We follow up after the job, and the work carries a one-year warranty. Regular work runs Mon to Sat, 7am to 5pm, same-day visits are often available, and emergency calls are answered 24/7.

We've put in subpanels in Portland, along with hot tub wiring and car chargers. If the car charger is going in a detached garage, read what a long run takes. And if the main panel turns out to be the real problem, we'll price a panel upgrade with it. Call us, or send the list and the photo, and we'll take it from there.

Frequently asked questions

What size subpanel do I need for a garage or shop?

It depends on what you run out there and what the house already carries. The size comes from a load calculation, which adds up the lights, outlets, tools, heat and chargers. The code requires it for the feeder. Send us the list and a photo of your main panel and we'll work it out before we quote. We size for what you plan to add later too, so you don't pay for a second upgrade.

Will a subpanel fix a full panel?

It fixes the room problem. It does not add power. A subpanel gives you more breaker spaces, but everything in it still comes through the main panel and the service. If the service is already near its limit, the service has to get bigger first. We'll check that before we quote.

Why must the neutral and ground be separate in a subpanel?

The neutral and the ground are tied together in one place, at the main panel. In a subpanel they stay on separate bars. If they're tied together at the subpanel, current that belongs on the neutral can travel on the ground wire and onto the metal cases of tools and appliances. That's a shock hazard, and it's one reason to have a licensed electrician wire a subpanel.

Does a detached garage or ADU need its own ground rods?

If it has a subpanel, yes. The code calls for a grounding electrode at a detached building that's fed by a feeder, and ground rods are the most common kind. The exception is a building fed by a single circuit that has a ground wire in it. The feeder still carries its own ground wire back to the house either way. Inspectors check this, and it's often missed on homeowner installs.

Do I need a permit to add a subpanel in Oregon?

Yes. Oregon law says no one may work on a new electrical installation until a permit is issued. The permit comes from the building department that covers your address, and the work gets inspected. The inspection looks at the feeder, the grounding, the neutral and ground separation, the labeling and the working clearances. We pull the permit and set up the inspections as part of the job.

Can I install a subpanel myself in Oregon?

Oregon law lets an owner do electrical work on a home they or an immediate family member own, if it isn't meant for sale or rent, and the permit and inspections still apply. In Portland the city says that doesn't cover an ADU or a rental. We'd have a licensed electrician do the wiring. The safe part to do yourself is the planning: the list of what you want to run, the distance and a photo of the panel with the cover on.

Does it cost anything to find out what I need?

Ballpark quotes for planned projects like a subpanel are free by phone or photo. Send the list of what you want to run, the distance and a photo of the panel with the cover on. The written estimate is the firm number.

Free printable guide

Take this guide with you

This whole page as one PDF you can print, save to your phone or pass along. No sign-up, no email.

Download the PDF

Sources and how to cite this page

Reviewed by Joshua Smiley, owner & master electrician at Smiley Electric, Portland, Oregon (Oregon CCB #227116). Last reviewed . General information, not a substitute for an on-site inspection.

Sources

  1. Lights, outlets, switches, and service reconnect for residential electrical permits, City of Portland Permitting & Development
  2. Residential Electrical Permits, City of Portland Permitting & Development
  3. Electrical Code Program: Codes and standards, Oregon Building Codes Division

Cite this page

Smiley Electric. “Do I need a subpanel for my garage, ADU or shop?” smileyelectric.net/help/subpanels-for-garages-adus-and-shops/. Last reviewed November 13, 2026.

You are welcome to quote, link to or share this page in articles, class handouts, AI answers and research, as long as you credit Smiley Electric and link back to smileyelectric.net/help/subpanels-for-garages-adus-and-shops/.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.