Skip to content

EV charger installation in Clackamas, OR

Most straightforward Level 2 charger installs across the Portland metro run $1,000 to $2,500 all-in. A long run to a detached garage or a panel upgrade pushes that to $3,000 to $5,000 or more. Send us a photo of your panel and tell us where the car parks. The ballpark is free. Joshua Smiley's crew does the work, pulls the permit and sees it through inspection.

MBE Certified · ESB Certified · Licensed, Bonded & Insured

Oregon CCB #2271164.7★ · 73 Google reviews

MBE Certified
ESB Certified
Licensed, Bonded & InsuredOregon CCB #227116
4.7★ · 73 Google reviews

What a car charger costs to put in

The charger itself is usually $350 to $650 of the bill. The rest is the electrical work: a 240-volt circuit of its own from your panel to where the car parks, plus the permit and the inspection. Those numbers come from our installs across the Portland metro. We don't have a separate price list for Clackamas, and we won't pretend to.

Ballpark quotes by phone or photo are free. A ballpark isn't the final number. That comes in a written estimate, and for some jobs we need to come look first. If the job turns up something bigger, we stop and tell you before we go on. Our cost guide goes through what moves the price up and down.

We put in hardwired chargers and 240-volt plugs both, and we're not tied to a brand. We'll help you pick the one that suits your car and your garage. Here's how a charger install goes.

Who comes to your house

Smiley Electric is Joshua Smiley's company. He's a Master Electrician with more than 20 years in the trade, and we're licensed, bonded and insured, Oregon CCB #227116. You can look that number up on the state's CCB site before you call. We're a Black-owned business, MBE and ESB certified.

A charger goes on a wall you walk past every day, so we treat it that way. We lay down protection in your garage, run the wire neatly, explain what we're doing in plain words, and clean up before we leave. After the job we follow up, and the work carries a one-year warranty. One customer who had us install a charger wrote: "Josh and his team did a great job installing a new EV charger. It was a 60 ft run from panel to charger, and all of it looks quite professional." Another wrote: "Same day service! Service tech was on time and installed 50A 240V circuit. Very professional!"

Regular work runs Monday through Saturday, 7am to 5pm. Same-day visits are often available, so call and ask. Emergency calls are answered 24/7.

You might not need one yet

The cord that came with the car plugs into a regular outlet. The U.S. Department of Energy puts that at about 5 miles of range for each hour it's plugged in, and a Level 2 charger at about 25. It also says many owners cover their daily driving by charging overnight on that cord alone, as long as the outlet is on a circuit of its own.

So if your drive is short, try the cord for a couple of weeks before you spend anything. If the car keeps coming up short in the morning, that's when to call us about a Level 2 circuit. We'd rather you spend the money once and be happy with it.

Most homes here went up after 1980. What matters is room in the panel

Census Bureau numbers for the 97015 ZIP code put the median home at 1994. More than a third of the homes went up in the 1990s, and fewer than one in ten are older than 1970. So at most houses here, the first thing we look at isn't the age of the wiring. It's how much room is left in the panel.

A newer house isn't a sure thing, though. A charger is a big load that runs for hours. Before we quote one, we add up what the house already runs and see what's left. Electricians call that a load calculation. We run it before we recommend anything, so you don't pay for capacity you don't need. We wrote up when a car charger needs a panel upgrade and when it doesn't.

If a panel is close to full, a load-management device can sometimes let the charger share the service with the rest of the house, backing off when other big loads run, instead of forcing an upgrade. We'll tell you honestly whether that fits your house or whether a bigger panel is the better call.

For the ballpark, open the panel door and take a photo of the breakers and the label. Leave the metal cover on.

If the panel does have to be replaced, that's a bigger job. Panel upgrades in the Portland area run $2,500 to $7,500, and doing the panel and the charger as one permitted job costs less than two separate visits. More on our Clackamas panel upgrade page. You'll know which way it's going before any work starts.

Clackamas isn't a city. Who gives the permit?

Clackamas is a mailing name, not a city. The 97015 ZIP code takes in unincorporated Clackamas County and part of the City of Happy Valley. For a charger it comes out the same on both sides of that line. The county issues electrical permits in its unincorporated areas, and the county's own chart shows it doing the electrical plan review and inspections inside Happy Valley too.

A charger circuit is new electrical work, and Oregon law says no work on a new electrical installation until the permit is issued. We pull the permit from Clackamas County and set up the inspection. You don't apply for anything, and nobody starts digging into your wall before the paperwork is right.

If PGE is your power company

Check your bill to see who your power company is. If it's PGE, look at its Smart Charging program before you buy a charger. PGE lists a rebate on a Level 2 charger and the installation for customers who enroll. It says a charger from its qualified list has to be hardwired and installed by a licensed electrician.

PGE lists a second rebate for a home whose main panel is under 200 amps and doesn't have room for a charger. That one only pairs with the charger rebate, and PGE asks for receipts that show the electrician's license number. The amounts and rules change, so read PGE's page for what's current, and tell us up front if you plan to apply. If heavier service work is needed, we line up the utility side with the county inspection so you aren't left chasing either one.

Jobs we've done around here

At Clackamas addresses we've replaced a 125-amp panel and added an outlet on the same job, been out for two breakers that kept tripping, and installed lighting. Down the road in Oregon City we've put in a car charger. Here's car charger installation in Oregon City and the rest of what we do in Clackamas.

Call us and tell us what you drive and where it parks. We show up when we say we will, and we want you to be sure of the job before we start. It's the kind of work we're happy to have neighbors compare.

Clackamas EV charger questions, answered

Clackamas isn't a city. So who issues my charger permit?

Clackamas County. The county issues electrical permits in its unincorporated areas, and it also does the electrical plan review and inspections inside Happy Valley. So a Clackamas address gets a county electrical permit on either side of that city line. We pull it and set up the inspection.

Do I need a bigger panel to add a car charger?

Not always. It depends on what your panel has room for and what the house already runs. Send a photo of the panel with the door open and the cover left on, and tell us what you drive. Ballpark quotes by phone or photo are free, and we'll tell you if we need to see it in person first.

Should the charger be hardwired or plugged in?

We install both. A plug-in charger uses a 240-volt outlet. A hardwired one has no plug. The wire goes straight into the charger. If PGE is your power company and you want its rebate on a charger from its qualified list, PGE says that charger has to be hardwired and installed by a licensed electrician. Tell us the car and we'll go over it with you.

Can I get a price without someone coming out?

Usually a ballpark, yes. It's free. Send a photo of the panel and tell us where the car parks and how far that is from the panel. A ballpark isn't the final number. That comes in a written estimate, and a long run or a full panel sometimes means we need to look first.

Is the cord that came with my car enough?

For some people it is. The U.S. Department of Energy puts a regular outlet at about 5 miles of range per hour of charging and a Level 2 charger at about 25. If your daily drive is short and the car sits all night, the cord may cover it. If you keep coming up short, that's when a Level 2 circuit makes sense.

What if my panel is almost full?

We run a load calculation first. Sometimes a load-management device lets the charger share the service with the house instead of forcing an upgrade, and sometimes a bigger panel is the honest answer. Either way you'll know which before any work starts.

Are you licensed, and is the work covered?

Yes. Joshua Smiley is a Master Electrician with more than 20 years in the trade. We're licensed, bonded and insured, Oregon CCB #227116. We pull the permit on every job that needs one. We follow up after the job, and the work carries a one-year warranty.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.