Skip to content

EV charger installation in Sherwood, OR

A straightforward home charger install runs $1,000 to $2,500, and a ballpark by phone or photo is free. Most Sherwood houses went up in the 1990s and 2000s, so the first thing we check is room in the panel. Josh Smiley's crew does the work, pulls the permit and stands behind it for a year.

MBE Certified · ESB Certified · Licensed, Bonded & Insured

Oregon CCB #2271164.7★ · 73 Google reviews

MBE Certified
ESB Certified
Licensed, Bonded & InsuredOregon CCB #227116
4.7★ · 73 Google reviews

You bought an electric car, or you're about to, and you want to plug it in at home. The job is a 240-volt circuit from your panel to where the car parks, with a charger on the wall or an outlet for a plug-in one. The faster kind of home charging is called Level 2. We've put in a car charger in Sherwood, and in Tigard next door, and we treat your garage the way we'd want ours treated: careful with the walls, neat with the wire, swept up when we leave.

Smiley Electric is Josh Smiley's company. Josh is a Master Electrician with 20+ years in the trade, and we're licensed, bonded and insured, Oregon CCB #227116. We're also MBE and ESB certified and Black-owned. When you call, you get someone who knows what a charger circuit takes, and you get a straight answer about it.

Ballpark quotes by phone or photo are free. Send us a photo of your panel with the door closed and tell us where the car parks. Don't take the cover off the panel to get the photo.

What a charger costs to put in

A straightforward Level 2 install runs $1,000 to $2,500 all-in. It's $3,000 to $5,000 or more when the job includes a panel upgrade or a long run to a detached garage. The charger itself is usually $350 to $650 of that, and the rest is the electrical work and the permit. Those are our numbers for the whole Portland area. We don't have a different price for Sherwood.

Two things move the number: how far the panel is from where you park, and whether the panel has room. A ballpark is a ballpark. The number that counts is the written estimate, and you get it before we start, so there's nothing to be surprised by later. For some jobs we have to see the house before we write it. Our car charger cost guide goes through each piece.

Will your panel handle it?

Most Sherwood houses aren't old. The Census Bureau's middle year for a Sherwood home is 1997, and about two out of three were built in the 1990s and 2000s. Nobody wired those houses with a car in mind, so we don't guess. We add up what the house already runs, like the AC, the range, the dryer and a hot tub if you have one, and see what's left. Electricians call that a load calculation. It's the step that keeps a charger from tripping your breakers on a cold night.

A charger gets a circuit of its own. The U.S. Department of Energy says most home Level 2 chargers run at up to 30 amps and need a dedicated 40-amp circuit. A bigger charger needs a bigger circuit. If the panel has the room, that circuit is the whole job.

If it doesn't, there are two ways to go. One is a load-management device that lets the charger share what the panel already has. The other is a bigger panel, which runs $2,500 to $7,500 in the Portland area. We tell you which one your house needs before you spend anything, and we'd rather tell you the cheaper way if it works. We wrote up whether a charger needs a panel upgrade, and there's a page on panel upgrades in Sherwood.

About one in eight Sherwood homes is from the 1970s. If yours is that age or older, expect us to look harder at the panel before we quote.

What you can expect from the crew

We show up when we say we will. We tell you what we're doing as we do it, and we answer your questions in plain words. One customer wrote that Josh and his team "did a great job installing a new EV charger. It was a 60 ft run from panel to charger, and all of it looks quite professional." Another wrote that we were "Competent, professional and friendly people who did a great job and cleaned up after themselves." That's how we want every job to go.

The wire gets run neat and the charger gets mounted where you can reach it. Before we leave we test the circuit and show you how it works. After the job we follow up to make sure it's doing what you bought it to do, and the work carries a one-year warranty. Same-day visits are often available, so call and ask.

When you don't need one

Not everybody needs a Level 2 charger. Most electric cars come with a cord that plugs into a regular outlet. The Department of Energy figures 8 hours on that cord puts about 40 miles back in a mid-size car. If you drive less than that most days, try it for a couple of weeks before you pay us for anything. If the outlet or the plug gets warm, stop using it and call.

Level 2 adds about 25 miles for each hour it's plugged in, by the same federal numbers. That's the one you want if you drive a lot more than 40 miles a day. We wrote up Level 1 against Level 2.

The permit comes from Washington County

Oregon law says nobody works on a new electrical installation until a permit is issued, and a charger circuit is one. We pull a permit on every job that needs one, and this one does. Sherwood has its own Building Department, but it doesn't handle electrical. The city says electrical work inside Sherwood is permitted and inspected by Washington County. So we pull the permit from the county, and a county inspector comes out to look at the work. You don't have to apply for anything, and you don't have to chase an inspector.

PGE's rebate, and what it asks for

Sherwood is on PGE. PGE has rebates for home chargers when you enroll in its Smart Charging program: up to $300 toward a Level 2 charger, and up to $1,000 toward the panel if your main panel is under 200 amps and can't take the charger. Both are higher if your household qualifies by income. The panel rebate only comes with the charger rebate, not alone.

There are strings. Enrolling lets PGE pause your charging from 5 to 9 on weekday evenings when demand is high, and you can opt out of one from the charging app. A charger on PGE's qualified list has to be hardwired and installed by a licensed electrician. For the panel money PGE wants receipts with the electrician's license number on them, and you get those from us. We don't build a rebate into your price. Programs change, so read PGE's page before you count on the money.

If your neighborhood has an HOA

Oregon law is on your side. In a planned community, the HOA may not prohibit a charger you put in for your own use in your own parking space or on your own lot. It can make you apply first. It can hold the charger to its architectural standards and charge a reasonable review fee. Once your application is complete, it has 60 days to approve it unless it reasonably asks for more information.

The same law says the charger has to be installed by a licensed electrician, and that's us. We keep the run tidy and the placement clean, so it's easy for the board to say yes. If the HOA asks for details on the circuit for your application, tell us what they want and we'll get it to you. There's more on the install itself on our EV charger installation page, and on the rest of what we do in town on the Sherwood page.

Ready when you are

Emergency calls are answered 24/7. Regular work runs Monday through Saturday, 7am to 5pm. For a charger, the easy first step is a call or a photo of your closed panel. Call us, tell us where the car parks, and we'll give you a straight ballpark and the next step.

Sherwood EV charger questions, answered

How much does it cost to install a car charger in Sherwood?

A straightforward Level 2 install runs $1,000 to $2,500 all-in, and $3,000 to $5,000 or more when the job includes a panel upgrade or a long run to a detached garage. The charger itself is usually $350 to $650 of that. Those are our Portland-area numbers, and Sherwood isn't priced differently. Ballpark quotes by phone or photo are free, and the written estimate is the number that counts.

Who handles the permit for a car charger in Sherwood?

Washington County. The City of Sherwood says electrical work inside the city is permitted and inspected by the county, not by the city Building Department. When we do the job we pull the county permit, and a county inspector checks the work. You don't apply for anything.

Can my HOA stop me from putting in a charger?

In an Oregon planned community, no. State law says an HOA may not prohibit a charger for your own use in your own parking space or on your lot. It can require an application, architectural standards and a reasonable review fee, and it has 60 days to approve a complete application unless it reasonably asks for more information. The law also says the charger must be installed by a licensed electrician.

Do I need a bigger panel to charge a car at home?

Not always. It comes down to what the panel has room for and what the house already runs. We add that up before we quote. If there isn't room, a load-management device that lets the charger share what the panel has can sometimes do it. If not, it takes a bigger panel. A photo of the closed panel and a short phone call usually tell us a lot.

Do you install a hardwired charger or a plug-in one?

Both. We wire a charger straight in, or we put in a 240-volt outlet for a plug-in one. We aren't tied to a brand. If you're going after PGE's rebate, look at PGE's qualified list first, because a charger on that list has to be hardwired and installed by a licensed electrician.

Is the work guaranteed, and who stands behind it?

Yes. Josh Smiley's company is licensed, bonded and insured, Oregon CCB #227116, and the work carries a one-year warranty. We follow up after the job to make sure the charger is working the way you expected.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.