What a charger costs to put in
A straightforward Level 2 install runs $1,000 to $2,500 all-in. It's $3,000 to $5,000 or more when the job includes a panel upgrade or a long run to a detached garage. The charger itself is usually $350 to $650 of that, and the rest is the electrical work and the permit. Those are our numbers for the whole Portland area. We don't have a different price for Sherwood.
Two things move the number: how far the panel is from where you park, and whether the panel has room. A ballpark is a ballpark. The number that counts is the written estimate, and you get it before we start, so there's nothing to be surprised by later. For some jobs we have to see the house before we write it. Our car charger cost guide goes through each piece.