Skip to content

EV charger installation in Oregon City, OR

A straightforward Level 2 charger install in Oregon City usually runs $1,000 to $2,500. Send us a photo of your panel with the door closed and tell us where the car parks, and you get a free ballpark by phone or photo. Josh Smiley, a master electrician with 20+ years in the trade, runs the company. We pull the city permit and stand behind the work for a year.

MBE Certified · ESB Certified · Licensed, Bonded & Insured

Oregon CCB #2271164.7★ · 73 Google reviews

MBE Certified
ESB Certified
Licensed, Bonded & InsuredOregon CCB #227116
4.7★ · 73 Google reviews

What a car charger costs in Oregon City

A straightforward Level 2 install runs $1,000 to $2,500 all-in. It's $3,000 to $5,000 or more when the job includes a panel upgrade or a long run to a detached garage. The charger unit itself is usually $350 to $650 of that.

Straightforward means the panel is in or next to the garage, it has open breaker space and room to spare, and the charger goes on a wall a short run away. These are the same numbers we use across the Portland area, and our cost guide goes through what moves the price.

Ballpark quotes by phone or photo are free. If the ballpark works for you, we write up an estimate. Some jobs we have to see before we can put a firm number on paper, and if the job turns up something bigger, we stop and tell you before any more work gets done. You know the number before we start. Call us and we can often get someone out the same day.

Who installs your charger

Smiley Electric is Josh Smiley's company. Josh is a master electrician with more than 20 years in the trade, and he runs it the way he'd want a neighbor's house treated. We're licensed, bonded and insured, Oregon CCB #227116, and you can look that number up on the state CCB site before you call. We're also MBE and ESB certified and Black-owned.

The guys show up when we say we will, explain what they found in plain words, keep the work neat and clean up when they leave. We follow up after the job to make sure the charger does what you bought it to do, and the work carries a one-year warranty. One customer wrote: "Josh and his team did a great job installing a new EV charger. It was a 60 ft run from panel to charger, and all of it looks quite professional."

Regular work runs Monday through Saturday, 7am to 5pm. Emergency calls are answered 24/7.

What Level 2 means, and when you can skip it

Level 2 is a charger on a 240-volt circuit. The U.S. Department of Energy puts it at about 25 miles of range for each hour the car is plugged in. A regular 120-volt outlet gives about 5.

So you may not need us. If you drive 30 or 40 miles a day and the car sits all night, a regular outlet can keep up. The Department of Energy says eight hours at 120 volts puts back about 40 miles on a mid-size EV. It also says that outlet should be on its own circuit, so ask an electrician about an old garage outlet before you count on it every night. We'd rather tell you that than sell you a charger you don't need. We compared Level 1 and Level 2 charging if you want more.

If you drive more than that, Level 2 is the answer. The charger gets its own circuit from the panel. We put in hardwired chargers and 240-volt outlets for the plug-in kind, matched to your car.

Will your panel take a charger?

That's what decides the price. The panel needs room for the charger on top of what the house already runs, like the range, the dryer, the water heater and a heat pump. We add all of that up before we quote. Electricians call it a load calculation. We do it carefully, so the circuit we put in is the right one the first time.

The Census Bureau counts about 14,650 homes in Oregon City. A little over half were built in 1990 or later, and about one in ten before 1940. The year the house was built won't tell you what your panel has room for, though. What tells us is a photo of the panel with the door closed and a list of the big things the house runs. Don't take the cover off.

If there isn't room, there are two ways to go. One is a load-management device that lets the charger share capacity, so the panel stays. The other is a panel upgrade, which runs $2,500 to $7,500 in the Portland area. We've put in a 200-amp panel in Oregon City, and the Oregon City panel page covers that job. We also wrote up whether a car charger needs a panel upgrade. We'll tell you which way makes sense for your house, and we'll tell you straight.

Older houses, detached garages and parking outside

The city's own history describes Oregon City as three levels above the river. Downtown is the bottom one. The McLoughlin neighborhood is up on the bluff, and the city dates its houses from the 1870s into the first quarter of the 1900s. Canemah, just above the falls, goes back to the riverboat days.

If your house is in one of those neighborhoods, have us look at the panel before you buy a charger. Older homes often have a smaller service, and we'd rather check it first than find out after the charger is on the wall. Then tell us where the car parks. If that's a detached garage or a spot away from the house, the wire has farther to go, and that's one of the things that puts a job at the higher end of the price range. We wrote up long runs to a detached garage and wire size on a long run.

Where the car parks outside, we use weather-rated gear and run the wire in conduit, so it lasts and looks tidy. On an older home we take care with where the charger goes, so it isn't bolted to the front wall facing the street.

If you're in one of the historic districts, you may wonder about the city's historic review. It's about changes to the outside of a house, and the city's list is windows, doors, siding and additions. In the McLoughlin Conservation District, only homes the city has designated need it. In Canemah, most homes do. If the charger is going on an outside wall and you're not sure, the city says to ask its Planning Division.

The permit comes from the city, and we pull it

A new charger circuit needs an electrical permit. Oregon's Building Codes Division says any job that installs or alters permanent wiring does. Inside the city limits, that permit comes from the City of Oregon City Building Division, and the city's own inspectors check the work. The Clackamas County building office is right here in town on Beavercreek Road, but it isn't where your permit comes from.

One catch. If your mail says Oregon City but the house is outside the city limits, out toward Beavercreek for example, the permit is a county one.

Either way we pull the permit and ask for the inspection as part of the job. You don't have to apply for anything or stand in a line. The city says an inspection requested before midnight is normally done on the date requested. Its inspectors work Monday through Friday.

Portland General Electric is the power company for Oregon City. If the job needs a bigger service, that gets coordinated with PGE, and that's on us too.

The PGE rebate: check before you buy the charger

PGE runs a Smart Charging program. Its page lists a rebate of up to $300 toward a charger install, and up to $1,000 toward a panel upgrade when the upgrade goes with a charger. The amounts are higher for income-eligible customers.

There are conditions. PGE says a charger you enroll has to be on its qualified list, hardwired, and installed by a licensed electrician. A car on its qualified list skips the charger-list rule. A panel upgrade has to bring the house to at least 200 amps. So look at PGE's list before you buy a charger, and call PGE to make sure the program is open. We don't build a rebate into your price, because we can't promise you'll get it. If you tell us which charger you're eyeing, we'll tell you if it fits the rules.

Oregon City EV charger questions, answered

Have you put in car chargers in Oregon City?

Yes. On one Oregon City job the guys did lighting, a car charger and a breaker replacement. We've also put in a 200-amp panel here, and a car charger across the river in West Linn. A customer on another charger job wrote that the 60 ft run from panel to charger looks quite professional.

Do I need a new panel to add a car charger?

Not always. It comes down to what your panel has room for and what the house already runs. Send a photo of the panel with the door closed and tell us the big things on it, like an electric range, a heat pump or a hot tub. If the panel is short on room, a load-management device is sometimes enough, and sometimes it takes a panel upgrade. We'll tell you which when we quote.

Should I get a hardwired charger or one that plugs in?

We put in both. One thing to know first: PGE's rebate rules say a charger you enroll has to be hardwired and on PGE's qualified list. If the rebate matters to you, check that list before you buy. Then tell us which car you have and where it parks, and we'll talk it through.

Does my charger permit go through Clackamas County?

Not if the house is inside the Oregon City limits. The City of Oregon City Building Division issues the electrical permit and its own inspectors check the work. If the house has an Oregon City address but sits outside the city limits, the permit is a county one. We pull the permit in both cases.

How long does a charger install take, and can you come soon?

It depends on the panel and how far the charger sits from it. Call us and tell us about the house. Same-day visits are often available, and emergency calls are answered 24/7. Regular work runs Monday through Saturday, 7am to 5pm. When we quote, we tell you what the job needs and what it costs before we start.

Is the work guaranteed?

Yes. Every job carries a one-year warranty, and we follow up after the work to make sure you're happy. We're licensed, bonded and insured, Oregon CCB #227116, and Josh Smiley, a master electrician with 20+ years in the trade, stands behind it.

Can I put in the charger circuit myself?

The city's electrical permit application has a line for owners. You sign that the work is on property you own and that the property is not intended for sale, lease, rent or exchange. The form points to Oregon law, ORS 479.540 and 479.560. The job still needs the permit and the city inspection. If that isn't your situation, hire a licensed electrical contractor and ask who is pulling the permit.

Tell us what needs fixing or what you’re planning.

Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.

Call (503) 484-7556Mon–Sat, 7am–5pm

Or request a callback

Saved callback details are kept for 7 days. Uncheck to withdraw your request.

We call back during business hours, Mon–Sat, 7am–5pm.