Hillsboro's big employers, Intel and the rest of the Silicon Forest, put a lot of steady commuters on the road, and for that pattern a home Level 2 charger just makes sense: plug in at night, leave with a full battery, and skip the public stations entirely. Because so many Hillsboro homes near Orenco, Reed's Crossing, and Quatama were built with panel headroom, the charger often drops in as a clean single circuit, and you are charging on your own schedule rather than someone else's.
The load check still comes first, and any service work runs through your utility. Hillsboro is Portland General Electric territory, so if a charger needs a heavier service, the meter disconnect is coordinated with PGE and timed to the city inspection. Any current PGE rebate on the charger runs through them, so check current availability, since those programs change. In the newer HOA neighborhoods we keep the mount and conduit tidy enough to clear an exterior-appearance review.