Electrical panel upgrade in Beaverton, OR
Out of breaker space, or adding an EV charger, a heat pump or an induction range? Send us a photo of your panel or call. We look at what you have and what your house really carries, tell you straight what it needs, then quote it, permit it and see it through inspection. Josh Smiley, a master electrician with 20+ years in the trade, stands behind the work.
MBE Certified · ESB Certified · Licensed, Bonded & Insured
Oregon CCB #2271164.7★ · 73 Google reviews
Is your Beaverton panel due?
Beaverton is a mix. The Census Bureau puts the median home here at 1987, and about one house in five was built in the 1970s. There are postwar and mid-century streets, a lot of 1970s and 80s houses, and 2000s subdivisions. The year your house went up does not decide the answer. What decides it is the equipment you have, the shape it is in, and the load the house is being asked to carry. If you are out of breaker space, or planning a Level 2 charger, a heat pump or an induction range, an electrical panel upgrade is often where that starts.
Some equipment is worth a look. A Federal Pacific or Zinsco panel can turn up in houses from the 1970s, and both brands have a record of problems as they age. Aluminum branch wiring is also worth a look in a house from the mid-1960s to the mid-1970s (here is how to think about aluminum wiring). That is the era, not a sure thing for your house. We look before we call anything a hazard, and if the panel is fine we tell you that too.
Lights that dip when the dryer starts, or a breaker that keeps tripping, are worth checking out. On their own they do not mean the panel has to go. It can be one circuit, one appliance or a worn-out breaker. We go through the panel, the service equipment and your real load before we recommend a thing. Not sure what you have? Here is how to tell if a panel is outdated.
Past owners leave things behind. One customer wrote that Josh "even made upgrades to my panel to repair things that had been installed incorrectly by previous owners and were potentially unsafe." That is the kind of thing we are looking for when we open a panel, and we show you what we found.
Sometimes the answer is capacity, not a replacement
A panel in good condition can still be out of room for a big new circuit. When that is what we find, we say so. The fix may be a subpanel and a few dedicated circuits, not a whole new service, and that is a smaller bill for you. We quote the scope the assessment supports, no more.
A new panel does not always mean 200 amps. We have put in 125-amp panels and done 200-amp service upgrades with a new meter and main in Beaverton. Which one fits depends on what the house runs now and what you want to add. If you are asking because of a charger, here is what a Level 2 charger needs from your panel.
Replacing the panel, or increasing the service?
Both get called a panel upgrade in Beaverton, and they are different jobs at different prices. Know which one you are buying before you line two quotes up next to each other. We write down which one it is, so you can compare.
| What you are comparing | Panel-only replacement | Service capacity increase |
|---|---|---|
| What changes | The panel and breakers are replaced at the same capacity, and grounding and bonding are brought up to current code. | The house is set up to draw more power than it can today, which can also reach the wiring from the meter, the meter base and the mast. |
| Who has to be involved | Whichever authority permits your address, for the permit and the inspection. We handle that. | That same permit authority, plus Portland General Electric, because changing the size of a service is scheduled with the utility. We handle that too. |
| What decides it | The panel itself is at the end of its life, but the house is not being asked to draw more than it already does. | A load calculation shows the equipment you are adding does not fit the service you have. |
The full five-point comparison, including what moves the cost of each one and what you should be holding at the end, is on our main panel replacement and upgrades page. We also wrote up the difference between a panel swap and a service upgrade.
The permit, and who actually issues it
Permit authority follows the property, not the mailing address. If your home is inside Beaverton city limits, residential electrical permits and inspections run through the City of Beaverton Building Division and its own electronic permitting system. Plenty of addresses that read "Beaverton" sit outside those city limits in unincorporated Washington County, and those are permitted and inspected by the county instead. Neighborhoods like Aloha are a common example.
You do not have to work out which office is yours. We confirm which authority covers your address before we file anything, pull the permit there, and meet the inspector when it is time. Permits are pulled on every job that needs one. As your licensed contractor, that part is ours, not yours. The city wants inspection requests in ahead of time, and a request made on the morning you want it lands on the next business day, so we ask early and plan the work around it.
Sizing it right, and coordinating PGE
Sizing a Beaverton panel is about the loads you actually run, not a default number. We run a real load calculation, weigh the circuits you have against the ones you are adding, and size the service so it has honest headroom. We would rather you have room for the next thing than be maxed out the day we leave.
Beaverton is Portland General Electric territory, so whenever an upgrade changes the size of your service, the disconnect and reconnect at the meter get scheduled with PGE. Installation, power restoration and final inspection are distinct milestones and may land on different dates, depending on the scope and on the utility's and the inspector's schedules. We confirm the expected outage, the utility steps and how the inspection gets scheduled with you before work starts. Handling that back-and-forth is part of the job, and you will not be left guessing when your lights come back on.
How the job goes, start to finish
You send a photo or call and tell us what the house is doing. We give you a ballpark. If it works for you, we look at the panel and the load, then put the scope and the price in writing before any work starts. We pull the permit, do the work, and our crew puts the house back the way we found it. We stay with it through the inspection, and we follow up after the job to make sure everything is right. The work carries a one-year warranty.
Another customer put it this way: "Great communication, very clean work, and very helpful with any questions I had along the way!" That is how we want every panel job to feel in your house. If something comes up after we leave, you call us, and you get Josh's company.
A completed Portland panel replacement
A 200-amp panel replacement we completed in Portland in July 2025, written up from the job record: the scope the homeowner approved in writing before it started, both visits, and the final inspection that closed it out.
- Where
- Portland, Oregon
- When
- July 2025
- Panel
- New 200-amp service panel
Final inspection passed on July 24, 2025. Permit pulled, inspector signed off, job closed.
July 22, 2025
Installation
July 24, 2025
Final inspection
“Oman and Isreal did an excellent job installing a new 200amp panel for us. These guys are a solid operation. Would use them again in a heartbeat.”
The agreed scope
- A new 200-amp panel with 40/60 spaces, and the old panel removed.
- Confirming the service wiring from the meter was rated for 200 amps.
- Grounding brought up to code, with a water pipe ground and dual ground rods.
- The permit and the inspection.
Every house brings its own scope, and your address is permitted by the authority that covers it. Read this as how we work rather than as a quote for yours. A Beaverton job gets the same care: the scope in writing first, a real permit, and an inspection that passes.
Read the full project recordWhat it costs, and where to read more
Panel upgrades across the metro generally fall between $2,500 and $7,500. Treat that as a planning range rather than a quote: a straightforward swap on a newer home sits lower than an older service that also needs entrance or grounding work, and some jobs land outside the range in both directions. We assess your panel, then put the price in writing before any work begins. If we find something bigger once the panel is open, we stop and tell you, and you decide. Nothing more is done until you say yes.
You do not need a visit to get started. Email a photo of your panel to josh@smileyelectric.net, or call and describe what you have, and we can usually give you a ballpark at no cost. Leave the cover on when you take the picture: a shot of the closed panel door from a few feet back is all we need, and there is live power behind that cover even with the main breaker off. A property manager wrote that they send "information about the issue plus a photo of the electrical panel" and get an estimate with a chance to schedule the work. That works for homeowners too.
The Portland panel upgrade cost guide breaks down every factor that moves your number and what a complete quoted scope has to settle. The main panel replacement and upgrades page carries the full scope comparison and the safe way to send us a panel photo. If a carrier letter is what brought you here, panel replacement for homeowners insurance covers the documentation side.
Who you are calling
Smiley Electric is Josh Smiley's company. He is a master electrician with 20+ years in the trade. We are licensed, bonded and insured in Oregon, CCB #227116, and you can look that number up on the state CCB site before you call. We are Black-owned, and MBE and ESB certified. Do the same with anyone else you are thinking of hiring: ask for the license number, and ask who is pulling the permit.
We show up when we say we will, explain what we found in plain words, and leave your house clean. Emergency calls are answered 24/7. Regular work runs Monday through Saturday, 7am to 5pm. Some days we can get out to you the day you call, so ask when you call. A customer with a 1950s house wrote: "Called on Friday and had an electrician out on Monday. Prompt, courteous and knowledgeable with clear pricing from the start."
Beaverton panel upgrade questions, answered
Do I need a panel upgrade before adding an EV charger in Beaverton?
Sometimes. A Level 2 charger is a significant dedicated load, and many older Beaverton homes are on panels without the spare capacity for it. We run a load calculation first. If your panel can carry the charger, we install the circuit and you do not pay for an upgrade you did not need. If it can't, we tell you up front and handle the upgrade rather than overload an aging service.
My Beaverton home is from the 1970s. Should I be worried about the panel brand?
It's worth a look, and a build year on its own does not settle it. About one Beaverton home in five went up in the 1970s, and houses from that era can carry Federal Pacific or Zinsco panels, whose breakers can fail to trip on an overload. That is an era-associated concern, not a certainty for your house, so we identify what is actually installed, lay out your options plainly, whether replacement or something less, and give you a clear, upfront quote. Send a photo of the closed panel door and we will tell you what we see.
Who inspects a panel upgrade in Beaverton?
It depends on whether the property is inside Beaverton city limits. If it is, the permit and inspection go through the City of Beaverton Building Division and its electronic permitting system. A Beaverton mailing address can still be in unincorporated Washington County, and those are permitted and inspected by the county. We confirm the authority for your address, file there, and see the inspection through as part of the job. You do not apply for anything.
Who supplies my power in Beaverton, and do they get involved in the upgrade?
Beaverton is Portland General Electric territory, and PGE gets involved whenever an upgrade changes the size of your service. We schedule the disconnect and reconnect at the meter with the utility and coordinate it with the inspection. Installation, power restoration and final inspection are distinct milestones and may happen on different dates, depending on the scope and on the utility's and the inspector's schedules, so we confirm the expected interruption and the steps before work starts. You do not have to make those calls yourself; coordinating the utility is part of what we handle.
Can I get a price without someone coming out first?
Yes. Email a photo of your panel with the door closed, or call and describe it, and we can usually give you a ballpark at no cost. The firm number comes in writing once we have looked at the panel and the load. Added work is never done until you have the price and say yes.
Is the work guaranteed, and can I check your license?
Yes to both. The work carries a one-year warranty, and we follow up after the job. Smiley Electric is licensed, bonded and insured in Oregon, CCB #227116, and the state CCB site lets you look that number up. Josh Smiley, our owner, is a master electrician with 20+ years in the trade.
Tell us what needs fixing or what you’re planning.
Call our office or request a callback to discuss the work and arrange the next step. For planned projects, start with a free ballpark by phone or photo. For troubleshooting and repairs, ask about an Electrical Service Appointment.
Got it.
We'll call you back during business hours, Mon–Sat, 7am–5pm. Need us sooner? Call (503) 484-7556.
Something went wrong on our end. Please call (503) 484-7556 and we'll take care of you.