On a boom-era Gresham home, a panel upgrade usually runs as a one-day service change, and knowing the sequence takes the mystery out of it. The utility disconnects the drop, we remove the old panel, set the new service and grounding, land the circuits, then get the utility reconnect and the inspection lined up so power is back the same day. Homes from the 1960s through the 1990s often have an overhead service to a mast, and if that mast or the meter base is as tired as the panel, we rebuild it in the same visit rather than leaving a weak link behind.
Gresham is Portland General Electric territory, so the disconnect and reconnect are coordinated with PGE. That pairs well with the city's daily in-house inspections: because both the utility side and the city side move quickly here, a Gresham service change tends to close out faster than the same job in a city that leans on the county. We handle the utility scheduling and the permit so the pieces line up.